Tender detail
Monitoring gaseous emissions and metrological control of measuring equipment at thermal power plants (2027–2029)
Summary
EDA – Electricidade dos Açores is procuring a 36-month service for 2027–2029 to monitor gaseous emissions and carry out metrological checks of continuous-emission measuring equipment at its thermal power plants and related facilities across the Azores. The work includes two monitoring campaigns per year, reports for each plant and metrological checks covering 25 emission sources; the specification lists 2,012 pollutant samples for the three-year period. The contract is not divided into lots.
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.