Tender detail

Design and construction of a renewable energy park

Summary

Aktsiaselts OG Elektra Tootmine is procuring the design and construction of a turnkey renewable energy park. The scope includes a battery energy storage system with at least 5.16 MWh of usable capacity, a photovoltaic solution, a new medium-voltage substation and grid connections, system integration, testing, commissioning, documentation, training and warranty-period obligations.

Reference number
316009-0000
Buyer
Aktsiaselts OG Elektra Tootmine
Country
Estonia (EST)
Procedure
Grant recipient purchase
CPV
45315300 Electricity supply installations
Deadline
2026-11-06
Status
Evaluation
Contract subject
Works
Estimated value
Not published
Source
RHR

Participation requirements

Tender requirements are available in the official tender documents.

Compliance requirements

The supplied machine-readable notice and tender documents did not specify precise exclusion grounds. These must be checked in the official tender documents.

Qualification criteria and exclusion grounds

The bidder’s average annual net turnover across the last three financial years completed by the start of the procurement must be at least EUR 3,500,000. The average is calculated by adding the turnover for those years and dividing by three. If the bidder has operated for less than three years, the average is based on the completed financial years in its period of operation. For a joint tender, the members’ average turnovers are added together. The bidder must provide turnover data or, if the data are unavailable from a register or the filing deadline has not passed, other reliable evidence or a confirmation showing the required turnover. During the 60 months preceding the tender submission deadline, the bidder or joint bidders must have properly completed at least two similar contracts. Taken together, the references must demonstrate a grid-connected energy solution in an industrial or comparable environment that included design, equipment supply, construction and installation, system integration, testing and commissioning; at least one BESS solution rated at 1 MW or more with usable energy capacity of at least 2 MWh, including PCS/BMS/EMS and grid integration; and at least one ground-mounted or industrial PV solution rated at 0.5 MWp or more. At least one reference must have been performed as main contractor or system integrator. Joint bidders may meet the requirements collectively, and one reference may demonstrate more than one requirement. For each reference, provide the project name and location, client, performance period, the referring company’s role, work description and relevant BESS, PV, control and grid-connection data, together with confirmation of proper performance and a client contact or other verifiable evidence. The bidder must name the project manager responsible for contract performance. The project manager must have at least five years’ experience managing complex electrical or energy infrastructure projects and experience leading at least one complete grid-connected BESS/PV or comparable industrial energy-system project. Submit a CV, description of experience and confirmation that the person will participate in contract performance. The person responsible for managing electrical works must hold A-level electrical competence, at least a level 7 electrical engineer qualification, or an equivalent foreign qualification, and demonstrable experience managing electrical works and functional settings at an industrial energy facility. Any registration or local permit required in Estonia must be in place by the start of the works, where legally required. The specialist responsible for electrical installation design must hold at least a level 7 certified electrical engineer qualification or equivalent, and be entitled to prepare project documentation of the required scope. The specialist must have experience designing at least one medium-voltage substation or medium-voltage grid connection and at least one industrial energy facility. The technical offer must include a consolidated table of the main equipment manufacturers and models; technical datasheets and certificates for the BESS, PCS, PV inverters, PV panels, EMS/control system, substation concept and fire-safety solution; a site-specific technical solution description; a preliminary single-line diagram and system architecture; warranty terms; and a description of maintenance and service arrangements. General product brochures that do not explain the site-specific solution and its compliance are insufficient. The bidder must explain and provide technical evidence for any proposed equivalent solution, showing at least the required function, performance, reliability, compatibility, safety and intended use. Any material departures from the preliminary design must be identified, with their effects on permits, approvals, schedule and price described. The contractor is responsible for preparing the detailed and working designs and the technical documents needed for any permit or approval amendments. The offer must provide a fixed total price in euros, excluding VAT, covering all required equipment, components, materials, design, studies, approvals, construction and installation, connections, testing, measurements, audits, commissioning, training, documentation, software and licences, warranty-period obligations, travel and accommodation, and other costs needed to deliver a fully operational solution. Mandatory work or components may not be left unpriced or deferred as additional work. Any paid maintenance, licences, remote services or other services required to maintain the offered warranty must be separately identifiable in the price. A site visit to the contract location and existing electrical installations is mandatory before submitting an offer. The bidder’s representative or a technical specialist involved in preparing the offer must attend by prior registration and at a time agreed with the contracting authority. The registration request must be sent at least three working days before the requested visit, and the final visit must take place at least seven calendar days before the submission deadline. Attendance is documented by the contracting authority; failure to attend in the specified manner makes the offer non-compliant. Minimum warranty periods are 24 months for design and construction works, 5 years for PV inverters, 15 years’ product warranty and 30 years’ linear power warranty for PV panels, 10 years for ground-mounting frames, and 5 years for the complete BESS. The BESS warranty must cover the battery modules, PCS, BMS, EMS, cooling and fire-safety systems and other functional components, including materials and labour needed to resolve a warranty claim. The bidder must provide the warranty form and manufacturer’s warranty documents, including terms, material operating restrictions, energy-throughput/cycle conditions and guaranteed usable capacity. The contractor must arrange and include in the total price all maintenance, inspections, licences, remote services and other paid services required by the manufacturer as a condition of warranty validity. For a critical fault, technical support or remote diagnostics must begin no later than 24 hours after the fault report is received. The bidder must state the maximum time to start support or remote diagnostics, the maximum time for a qualified repair team to reach the site if needed, and the maximum number of working days to deliver necessary critical-fault spare parts or components to the site, and explain how these times are ensured. The stated times and service arrangements will form part of the contract. Joint tenders are permitted. Joint bidders must name a lead partner and confirm their cooperation arrangements for the joint offer and contract performance. Where a member’s experience is relied on for qualification, that member must perform the part of the contract for which its experience is required. The offer must be unconditional and confirm compliance with the tender documents; it must cover a fully operational turnkey solution and meet the technical specification and applicable project requirements. No award-scoring criteria were specified in the supplied documents.