Tender detail
Construction of a storage reservoir in Colungo
Summary
The Municipality of Colungo is procuring construction works for a raw-water storage reservoir to improve summer water reserves and provide water access for firefighting and livestock. The works include excavation and embankment, connection and drainage chambers, PEAD pipelines, waterproofing of the reservoir basin, two 500-litre livestock drinking troughs, and a 2-metre perimeter fence with a 3-metre gate. The estimated value is EUR 65,372.48 excluding VAT, and the maximum budget is EUR 79,100.70 including 21% VAT. Price is the sole award criterion, and tenders must be submitted electronically. The tender summary table states a four-month construction period, while the explanatory memorandum states one month; check the tender documents to confirm the applicable deadline. The warranty period is 12 months.
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.