Tender detail
Replacement of the overhead power line at Zalaegerszeg Logistics Park
Summary
Zalaegerszeg Municipality is procuring a single-lot electricity infrastructure project for the logistics park near Zalaegerszeg and Zalaszentiván. The works include dismantling 787.7 m of existing 22 kV overhead line and an existing transformer, installing 22 kV underground cables of 430.1 m and 803.8 m and 596.7 m of 0.4 kV underground cable, and installing a compact concrete transformer station with the existing 250 kVA transformer relocated into it. The works are to be completed within 150 calendar days from handover of the site.