Tender detail
Gym roof replacement works at Ramón de Campoamor Public School
Summary
The Principality of Asturias Department of Education is procuring the integrated renovation of the gym at Ramón de Campoamor Public School in Navia. The works include removing the existing curved and flat roofs, which contain deteriorated asbestos cement, installing a new thermally and acoustically insulated roof system, renewing translucent gable panels, rehabilitating perimeter walls, improving rainwater collection and drainage, and rebuilding the surrounding pavements. The contract is not divided into lots, has a maximum execution period of eight weeks and a budget of €279,935.32 including VAT.
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.