Tender detail

Railway switch modification works at Atocha Cercanías station

Summary

ADIF is procuring construction works at the Recoletos-end approach to Atocha Cercanías station to renew and modify railway track switches and improve the track alignment and structure. The works include renewing switches 22 and 6, crossover 10 and the connection between tracks 4C and 5C (switches 24–26), changing the track formation from slab track to ballast, removing affected signalling equipment and adapting the existing overhead contact line. The contract is not divided into lots, has a three-month term and a tender budget of €2,829,442.64 excluding VAT.

Reference number
3.26/27507.0047
Buyer
ADIF - Presidencia
Country
Spain (ESP)
Procedure
Open procedure
CPV
45234110 Intercity railway works
Deadline
2026-10-23
Status
Open
Contract subject
Works
Estimated value
3 423 625,59 EUR
Source
ESP_PLACSP

More tender information after sign-in

The public view shows key tender details. Sign in to open official links, documents and AI tender support.