Tender detail
Repair of stormwater drainage on Platform Y
Summary
Aena S.M.E., S.A. is procuring works to repair stormwater drainage on Platform Y at Santiago–Rosalía de Castro Airport and prevent heavy rainwater from flooding Hangar 5. The works include installing 30 m of F900 and 15 m of D400 drainage channels, a 1 × 1 m inspection chamber and connecting pipes, together with excavation, reinstatement of paving and markings, waste management, and airport operational safety measures. The contract also includes final technical documentation; the maximum execution period is two months.
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.