Tender detail

Construction and maintenance of the energy remote-control system on the Ronda–Algeciras railway section

Summary

ADIF is procuring construction and subsequent maintenance of the energy remote-control system for the Ronda–Algeciras section of the Bobadilla–Algeciras railway line in Málaga and Cádiz. The works include remote-control nodes, local power and communications networks, intelligent control devices and related auxiliary civil works at the specified railway locations; preventive and corrective maintenance follows for 24 months. Construction and maintenance each last 24 months, for a total contract period of 48 months. The tender budget is €8,797,967.95 excluding VAT; the estimated contract value, including the possible extension, is €9,239,222.58 excluding VAT. The contract is not divided into lots.

Reference number
4.25/06110.0362
Buyer
ADIF -Consejo de Administración
Country
Spain (ESP)
Procedure
Open procedure
CPV
45234000 Construction work for railways and cable transport systems
Deadline
2026-10-16
Status
Open
Contract subject
Works
Estimated value
10 645 541,22 EUR
Source
ESP_PLACSP