Tender detail

Design and construction works for the reconstruction of Rummu wastewater treatment plant

Summary

Aktsiaselts Lahevesi is procuring the design and reconstruction of the Rummu wastewater treatment plant in Rummu, Lääne-Harju municipality. The works include surveys and design, reconstruction as an activated-sludge plant using SBR technology (stage one: 1,555 PE), reconstruction of two biological ponds, construction of a wastewater receiving facility and regional excess-sludge treatment (stage one: 3,678 PE), access roads, paved areas and external networks, electrical, automation and remote-monitoring systems. The scope also includes keeping the existing plant operational during construction, commissioning, trial operation and training.

Reference number
317724-0000
Buyer
Aktsiaselts Lahevesi
Country
Estonia (EST)
Procedure
Võrgustikusektori lihtsustatud menetlus
CPV
45252127 Wastewater treatment plant construction work
Deadline
2026-12-11
Status
Open
Contract subject
Works
Estimated value
Not published
Source
RHR

Participation requirements

Tender requirements are available in the official tender documents.

Compliance requirements

A bidder may be excluded if it has failed to pay taxes or social security contributions. For Estonian tax debts, the tax authority does not issue a debt certificate where the debt is below EUR 100 or its payment has been rescheduled; for a foreign bidder, the rules of its country of establishment apply. A ground for exclusion may also arise from a significant or repeated breach of a previous public contract that resulted in early termination, a price reduction, compensation for damage or a comparable sanction. Where applicable, the bidder may submit evidence of measures taken to restore its reliability. During contract performance, first-tier subcontractors will be checked for payment of taxes and social security contributions. Subcontractors in subsequent tiers will not be checked, and subcontractor ESPDs are not required.

Qualification criteria and exclusion grounds

The bidder’s average annual net turnover for the last three completed financial years, 2023–2025, must be at least EUR 1,200,000. The bidder must demonstrate: - At least two properly completed construction contracts during the 96 months preceding the start of the procurement, for building or reconstructing an active-sludge wastewater treatment plant with a capacity of at least 1,000 population equivalent (PE), including installation and commissioning of process equipment. - At least two wastewater treatment plant construction designs prepared during the 60 months preceding the start of the procurement, at least at main-design stage, for plants with a capacity of at least 1,000 PE; a building permit or building notice must have been issued on the basis of each design. The project manager/responsible construction manager must have managed the construction or reconstruction of at least one wastewater treatment plant with a capacity of at least 1,000 PE. The design manager must hold the professional qualification “Chartered Water Supply and Sewerage Engineer, Level 8” or an equivalent qualification, and must have acted as the responsible specialist for at least one wastewater treatment plant design of at least 1,000 PE, at least at main-design stage. The bidder must operate a quality management system compliant with EVS-EN ISO 9001 or equivalent measures, and an environmental management system compliant with EVS-EN ISO 14001 or equivalent measures. Submit the relevant certificates or descriptions of equivalent measures. The bid must comply with the tender documents, and any claimed equivalence must be explained and supported by evidence. The bid price must follow the structure set out in the bill of quantities and the designated pricing schedule. Joint bidders must appoint an authorised representative and include the relevant power of attorney. The bidder must identify and justify any trade secrets; the bid price and other evaluation-related numerical indicators may not be declared trade secrets. The bidder must confirm that it will not use a subcontractor that would have to be replaced under the applicable subcontractor-replacement rules. No award criteria or scoring details are specified in the provided text.