Tender detail
Expansion and modernisation of the bio-waste composting facility in Racibórz
Summary
Racibórz Recycling Centre R3 is procuring the design, permitting, construction and commissioning of an expanded biological treatment and composting facility for separately collected biodegradable waste at its site on Rybnicka Street in Racibórz. The single, undivided project includes four composting tunnels with a combined minimum area of 476 m², process and storage halls, a biofilter, water and wastewater systems, electrical and control systems, covered and paved process areas, and associated equipment. The installation is designed to process at least 8,000 tonnes of biodegradable waste per year.
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.