Reconstruction of the main switchboard in Kitchen Building II
Summary
The Provincial Multi-Specialist Hospital in Leszno is procuring the design, supply and complete reconstruction of the low-voltage main switchboard in its kitchen building. The work includes removing the existing switchboard, installing and commissioning a new one, providing temporary power, transferring existing circuits, and carrying out the required measurements, tests, inspections and handover. The new installation must support the hospital’s existing circuits and maintain power to critical circuits during the works. Completion is required by 30 November 2026.