Tender detail
Replacement of the Oste Bridge with road alignment improvements
Summary
The Lower Saxony State Authority for Road Construction and Transport is procuring the replacement of the Oste Bridge on the B 73 between Hechthausen and Burweg. The new bridge will be built south of and parallel to the existing structure, with bored-pile foundations, a prestressed reinforced-concrete superstructure, bridge drainage, waterproofing and asphalt surfacing. The works also include temporary sheet-pile cofferdams and access platforms, riverbank protection, removal of preload materials, and associated environmental and construction-site measures; the contract is not divided into lots.
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.