Tender detail
ABS 38 supplementary ground investigations for drainage design, PA03 Eastern Section
Summary
The procurement covers supplementary ground investigations for drainage planning in the eastern section of project ABS 38, PA03. The works include setting up the site; surveying approximately 1,200 investigation points, including drilling notifications and geocoordinates; approximately 1,200 preliminary excavations; drilling and backfilling approximately 1,600 metres of boreholes; 495 exploration pits at depths of 1.25–5 metres and 470 smaller pits at depths of 0.5–1.25 metres. It also includes approximately 965 infiltration tests documented in accordance with DWA A 138-1 and 320 open-end tests documented in accordance with DIN 19682-8 to determine the ground’s infiltration capacity.
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.