Construction of a solar power plant with battery energy storage in Zagorje ob Savi
Summary
HOLDING SLOVENSKE ELEKTRARNE d.o.o. is procuring, in one lot, the design, supply, installation, testing and commissioning of a 1.38 MWp solar power plant and a battery energy storage system rated at 1.25 MW with a capacity of 5 MWh at the closed Kamnolom Zagorje landfill in Zagorje ob Savi. The works also include the associated transformer station, electrical and control equipment, civil works, site drainage, access and fencing, and connection to the medium-voltage grid and the buyer’s control centre. The turnkey contract is planned to last 10 months.