Construction works to modify the Arlberg-bound exit from Bludenz station
Summary
ÖBB-Infrastruktur AG is procuring the main construction works to modify the railway exit from Bludenz station towards Arlberg. The works include a double-track section with a larger curve radius between approximately km 133.900 and km 135.100, and related signalling adaptations, including cabling and signal locations, in the Braz and Bludenz station areas. The planned contract period is 1 March 2027 to 30 June 2030.