Feasibility Studies for Railway Electrification in Three Lots
Summary
C.N.C.F. “C.F.R.” S.A., through its Cluj Regional Railway Branch, is procuring feasibility studies in three lots for the electrification of the Arad–Oradea route on line 328, the Oradea–Carei–Satu Mare route on line 400, and the Satu Mare–Baia Mare–Jibou–Dej route on lines 401 and 412. The studies cover fixed electric traction installations, including power-supply systems, overhead contact lines and control equipment, as well as the necessary signalling, electrical-supply and track-layout modifications. Each lot has a 15-month duration, and each study must technically and economically compare at least two options.