Tender detail

Feasibility Studies for Railway Electrification in Three Lots

Summary

C.N.C.F. “C.F.R.” S.A., through its Cluj Regional Railway Branch, is procuring feasibility studies in three lots for the electrification of the Arad–Oradea route on line 328, the Oradea–Carei–Satu Mare route on line 400, and the Satu Mare–Baia Mare–Jibou–Dej route on lines 401 and 412. The studies cover fixed electric traction installations, including power-supply systems, overhead contact lines and control equipment, as well as the necessary signalling, electrical-supply and track-layout modifications. Each lot has a 15-month duration, and each study must technically and economically compare at least two options.

Reference number
702888-2026
Buyer
C.N.C.F. ,,C.F.R." S.A. - SUCURSALA REGIONALĂ C.F. CLUJ - UNITATE OPERAȚIONALĂ
Country
Romania (ROU)
Procedure
Open procedure
CPV
71241000 Feasibility study, advisory service, analysis
Deadline
2026-11-24
Status
Open
Contract subject
Services
Estimated value
109 068 300,00 RON
Source
TED

More tender information after sign-in

The public view shows key tender details. Sign in to open official links, documents and AI tender support.