Tender detail
Noise Measurements at Windplan Blauw
Summary
The Municipality of Dronten is commissioning representative source-noise measurements of Vestas V162-6.0 MW wind turbines at Windplan Blauw. Measurements are intended for the six identified turbines, with at least four to be measured if conditions prevent measuring all of them. The contract also includes draft and final reports presenting measured source power per wind speed, measurement results and supporting appendices; these are due by 26 April and 30 June 2027 respectively. The procurement is a single lot.
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.