Tender detail
Installation of photovoltaic panels on the flat roof of the GEA building at the IUT of Bourges
Summary
The tender concerns the installation of a 63.7 kWp photovoltaic power plant on the bitumen-waterproofed flat roof of the GEA building at the IUT of Bourges. The system will be connected for individual self-consumption with surplus electricity fed into the grid; a control system with metering equipment must prevent unused energy from being fed into the public grid. The estimated contract duration is 15 months and the estimated value is EUR 80,000. The tender submission deadline is 12 October 2026 at 12:00. Bidders should be prepared to provide company registration evidence, turnover and tax-compliance documents, and information on their human and technical resources. Site visits are scheduled for 22 and 24 September 2026 at 09:00; attendance must be confirmed by email to the contacts specified in the notice.
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.