Tender detail
Construction of a bridge over the Mataroni Creek
Summary
The procurement concerns the construction of a forest bridge over the Mataroni Creek in Guyane, with an estimated overall value of EUR 950,000–1,150,000 and an indicated duration of 5 months. The contract is divided into two successive lots: Lot 1 for timber bridge structures, estimated at EUR 950,000, and Lot 2 for earthworks and stormwater management, estimated at EUR 40,000. The deadline for tenders is 28 September 2026. Lot 1 covers the complete timber structure, driven timber piles, beams, joists, decking, wheel guides, guardrails, drainage, fixings, protective systems and related execution studies. Lot 2 covers site installation, stripping, excavation and reuse of materials, imported fill, seeded erosion-control matting, drainage ditches, a fines-retention structure and as-built documentation. The tenderer must include the required technical studies, materials, equipment, testing, site coordination, waste management and final documentation in its price. The tender documents indicate that no negotiation is envisaged; the documents also state that variants are not generally permitted, while specific technical variants are permitted for certain Lot 1 protection systems.
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.