Tender detail
Supply of treated pine posts for fencing along the Río Tinto Green Corridor
Summary
Empresa de Transformación Agraria (Tragsa) is procuring 7,836 treated, turned pine posts for constructing fencing along Stage 1 of the Río Tinto Green Corridor in La Palma del Condado, Villarrasa and Niebla (Huelva). The supply comprises 2,179 posts, 12 cm in diameter and 1.5 m long, with one bevelled end, and 5,657 posts, 10 cm in diameter and 2 m long. Delivery is to the worksites; the contract is not divided into lots.
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.