Tender detail
Restoration of the Quintana Well with a New Connection to the Albereda Reservoir
Summary
Sant Julià de Vilatorta Town Council is procuring construction works to restore the Quintana well by installing a new pressure pipeline connected to the College well pipeline and carrying water to the Albereda reservoir. The works include pipe installation, excavation, reinstatement of road surfaces and associated structures; the project specifies 190 metres of PE100 DN63 pipe. The contract is not divided into lots, the works are scheduled to take 1.5 months, and the budget is €194,773.97 excluding VAT.
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.