Tender detail
Runoff and flood study, sewer network mapping and management plan
Summary
The tender covers technical assistance to the Municipality of Alhaurín el Grande to prepare a runoff and flood study for the Arroyo de la Villa catchment, map and technically process the municipal sewer network, and draft an Integrated Management Plan for the Sanitation System (PIGSS). The work requires specialist expertise and resources that the municipality does not have available. The contract is co-funded by the European Regional Development Fund. The estimated value is EUR 273,000 excluding VAT; the budget limit is EUR 330,330 including VAT. This is an open electronic procedure, with a submission period of 35 calendar days from dispatch of the contract notice. Consult the tender documents for the detailed participation and bid requirements.
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.