Tender detail
TOP Plusz municipal works II
Summary
Magyar Közút is procuring construction works in two lots. Lot 1 covers a vehicle axle-load and gross-weight weighing station at the Beregsurány road border crossing, including scales, measuring equipment, traffic-control systems, utilities and related structures; optional works include road-shoulder paving. Lot 2 is the construction of approximately 5.36 km of cycling route in Makó, divided into seven sections, including road and path works, railway-crossing works, drainage and traffic arrangements.
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.