Supply and installation of a photovoltaic system with storage for Argeș Forestry Directorate
Summary
The National Forest Administration Romsilva, through the Argeș Forestry Directorate, is procuring one fully equipped, off-grid photovoltaic system with energy storage to power the water pump supplying the lake at the Mozacu hunting enclosure. The system includes photovoltaic panels with a minimum installed capacity of 2.76 kWp, a single-phase hybrid inverter rated at least 6 kW, a LiFePO4 battery of at least 11.7 kWh with an integrated heating system, a mounting structure, and the necessary protection, cabling and earthing equipment. The supply includes transport, installation, configuration, testing and commissioning, to be completed no later than 31 December 2026. The procurement has one lot.