Tender detail

Construction of the Zagorje ob Savi solar power plant with battery energy storage

Summary

The procurement covers the design, supply, installation, testing and commissioning of a 1.38 MWp solar power plant and a battery energy storage system rated at 1.25 MW with a capacity of 5 MWh. The works will be carried out at the closed Kamnolom Zagorje municipal waste landfill in the municipality of Zagorje ob Savi and include the transformer station, electrical and control connections, associated civil works, drainage, access paths and fencing. The contract also includes project and as-built documentation, testing, staff training and connection to the distribution network and the HSE control centre. The works are procured as a single lot and are planned to take 10 months.

Reference number
693365-2026
Buyer
HOLDING SLOVENSKE ELEKTRARNE d.o.o.
Country
Slovenia (SVN)
Procedure
Open procedure
CPV
45000000 Construction work
Deadline
2026-11-06
Status
Open
Contract subject
Works
Estimated value
Not published
Source
TED

More tender information after sign-in

The public view shows key tender details. Sign in to open official links, documents and AI tender support.