Tender detail
Design and construction works to improve the energy efficiency of Võru wastewater treatment plant
Summary
The procurement covers a complete design-and-build solution to improve the energy efficiency of the Võru wastewater treatment plant. The works include replacing SBR aerators, SBR air blowers, SBR mixers, and the air blowers of the sludge thickeners and grit chambers; implementing demand-based automatic control of the treatment process; and applying the energy audit monitoring plan. The contractor must design the complete solution, supply and install the equipment, carry out electrical and automation works and programming, test and commission the systems, conduct trial operation, prepare documentation, and train the contracting authority’s staff. Participation requires an average annual turnover of at least EUR 400,000 for 2023–2025, at least two relevant wastewater treatment plant projects completed during the preceding 120 months, the specified qualified project, site, design, electrical, automation and SCADA personnel, and the required professional registrations. The tender must also include the required forms, subcontractor information and consents, price schedule, signing authorisation where necessary, and confirmations concerning sanctions, equivalence and compliance with the procurement documents.
Participation requirements
Tender requirements are available in the official tender documents.