Generator and infrastructure works for the hospital’s power supply
Summary
The Regional Hospital “Dziekanka” in Gniezno is procuring a generator to supply the hospital with electricity, together with site preparation, installation and commissioning, and associated electrical and infrastructure works. The works include upgrading the main switchboard and automatic transfer system, installing cable routes, technical ducting and site monitoring, and training hospital staff. The supply also includes a fuel rotation and cleaning system for two tanks with a combined capacity of 2,000 litres, with a pump capacity of at least 30 litres per minute.