Tender detail
Stage I of the Tarło Kolonia village community centre construction – building to zero level
Summary
The tender covers Stage I of a village community centre project in Tarło Kolonia: constructing the building to zero level, meaning up to the level of the floor on the ground. The works include site preparation and earthworks; foundations and underground structural elements; damp-proofing and thermal insulation and drainage; the sub-base and structural layers for the ground floor and the concrete slab or floor to the extent shown in the design; necessary ducts and underfloor utility sections; dewatering and protecting excavations; surveying, tests, measurements, handover records and protecting the completed works until the next construction stage. The contractor must complete the works and hand over the full documentation for this stage. Above-ground walls, the roof, finishing works and other later construction stages are generally excluded. The completion period is 3 months from contract signature. The bid deadline is 14 October 2026 at 10:00. Bidders must provide a team with the required construction qualifications: a construction manager and roadworks, sanitary works and electrical works managers. One person may cover more than one role if qualified for each. The bid must offer a 36–60 month quality guarantee. Price carries 60% and the guarantee period 40% of the evaluation score. The successful bidder must provide performance security equal to 5% of the contract price when signing the contract and maintain liability insurance throughout the contract with coverage of at least 50% of the gross contract price. Physical construction work, equipment operation and physical installation and assembly work must generally be carried out by employees hired under employment contracts.
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.