Tender detail
Chmieleniec forest road reconstruction – Stage I, length 1.230 km
Summary
The tender concerns the reconstruction of a forest road in Chmieleniec – Stage I, 1.230 km long, within Leśnictwo Strzebielino, and the overall project length of 4.055 km. The contract includes preparing and implementing the temporary traffic organization (COR) for the forest road connection with the county road, obtaining approvals, and carrying out associated works such as geodetic surveying, tree felling and removal, earthworks, drainage, road pavement with concrete/gravel materials, and related infrastructure works. The contractor must ensure compliance with health and safety regulations, provide project management and coordination, and carry out the works in accordance with the SWZ, construction documentation, and applicable laws. The term of execution is up to 120 days from contract signing (with winter break 16 December 2026 to 15 March 2027), and the contract includes a 36-month warranty. The bid must include performance security and comply with employment and subcontracting rules. The price constitutes 60% of the award criteria, execution time 20%, and an independent execution (self-performance) criterion 20%. Involvement of joint ventures is allowed, and the contractor bears responsibility for subcontractors’ performance and payments. The procurement uses standard Polish public procurement procedures for a non-EU threshold contract.</summaryEn>
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.