Construction supervision services divided into lots
Summary
The tender concerns construction supervision services divided into two lots. Lot 1 covers supervision of road modernisation works and the repair of a roundabout in the Lewin Brzeski area; Lot 2 covers supervision of the modernisation of infrastructure damaged by the September 2024 flood, including a road and bridge in Głębocko. Bids may be submitted for both lots, and both lots may be awarded to the same bidder. Price is the only award criterion for each lot, with a weighting of 100%. The stated contract duration is 98 months for Lot 1 and 134 months for Lot 2; the expected construction period is 14 months for each lot, followed by supervision of final settlement and the warranty and defects-liability period. The bid must be submitted electronically by 10 September 2026 at 10:00. No bid guarantee or performance security is required.