Tender detail

External control of studies and construction works for the RN13 south-western Evreux bypass

Summary

The tender concerns external control of construction works for the RN13 south-western Evreux bypass. The works include the Fayaux and Cambolle interchanges, the northern ramp of the Arnières-sur-Iton half-interchange, a wildlife crossing, a 7.3 km main section and noise barriers; the services do not cover the entire external control scope. The contract is divided into three lots: reinforced review of calculations and drawings (VISA, V3 level), supervision of geotechnical construction works (G4), and checks of documentation, materials, construction execution, tests and work methods. The planned duration is 48 months. Offers must be submitted electronically and electronically signed; variants are not allowed. A tenderer may bid for all three lots and may be awarded all three. The submission deadline is 4 November 2026 at 12:00.

Reference number
26-95192
Buyer
DREAL Normandie
Country
France (FRA)
Procedure
Procédure Ouverte
CPV
71631000 Technical inspection services
Deadline
2026-11-04
Status
Open
Contract subject
Services
Estimated value
Not published
Source
FRA_BOAMP

More tender information after sign-in

The public view shows key tender details. Sign in to open official links, documents and AI tender support.