Tender detail
Replacement of air coolers for cold production at Lyon Sud Hospital, Building 1D
Summary
The tender concerns construction works to replace the air coolers serving cold production in Building 1D of Lyon Sud Hospital in Pierre-Bénite. The estimated contract duration is 5 months. Tenders will be evaluated on price (60%) and technical value (40%). The technical assessment covers, among other things, the suitability of the human and material resources, arrangements for managing and limiting disruption, continuity of hospital operations, and the technical performance of the equipment. The procedure for the required site visit and the social clause must be checked in the tender documents before submitting a bid.