Tender detail
Rehabilitation of the Ritarinpuisto bridges – design-and-build contract
Summary
The procurement concerns the replacement of Ritarinpuisto’s vehicle bridge and pedestrian and cycle bridge in Porvoo, including construction design and construction as a design-and-build contract. The contractor will act as the main contractor and principal contractor responsible for site safety obligations. The tender must be based on a total price, with the bidder calculating the required quantities of materials, supplies and work and including preparation of the construction design. A site presentation will take place on 31 August 2026 from 12:00 to 13:30; participants’ details must be sent to matias.pietila@porvoo.fi by 10:00 on the same day. The tender deadline is 8 September 2026 at 09:00.
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.