Tender detail
Water network construction for the scattered farmhouses of El Far d'Empordà
Summary
The tender covers construction works to extend the interconnected drinking-water network in El Far d'Empordà and connect 29 scattered farmhouses. The works include pipelines and service connections in three linked zones, using high-density polyethylene pipes with diameters of 63–180 mm and 32 mm connection pipes. The works must be completed within six months. The budget is €800,629.71 excluding VAT and €968,761.95 including VAT. Bids are scored out of 100 points: up to 25 for the technical execution plan, with at least 12.50 points required to proceed; up to 50 for price; and up to 25 for technical improvements at no extra cost. To participate, bidders must meet the required works-contractor classification or the alternative financial and experience requirements, and submit a responsible declaration and technical proposal. The contractor must provide a continuously present site manager, carry out quality tests, and submit the required work and safety plans.
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.