Tender detail
Construction and upgrade of facilities at the Organyà waste recycling centre
Summary
The contract covers construction work to upgrade the existing waste recycling centre in Organyà and make it safe and operational. The work includes demolishing unsafe existing shelters, building an approximately 98 m² reception, access-control and storage facility for small electrical and electronic equipment waste and special waste, and paving around 1,613 m² of operational outdoor areas. It also includes groundworks, foundations and structures, stormwater drainage, a fire hydrant and outdoor lighting, infrastructure for a truck weighbridge, electrical and telecommunications connections, slope treatment, and quality and safety measures. The contract is not divided into lots, and alternative solutions are not permitted. The tender budget is €194,414.73 excluding VAT (€235,241.82 including VAT). The estimated execution period is 45 days; work must start no later than 15 November 2026 and finish no later than 21 December 2026. The tender documents specify a submission deadline of 22 October 2026 at 14:00. Price is worth 70 points, and fully offered improvements are worth up to 30 points in total: ground preparation and foundations, structures, facades and partitions, installations, and roofing. Bidders must demonstrate the required financial and technical capacity and submit the specified declarations and evidence. During performance, waste must be removed selectively and a waste-management plan submitted that prioritises CE-marked recycled aggregates and reduces landfill disposal; earthworks, foundations and masonry must be carried out directly by the main contractor.
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.