Tender detail
Partial resurfacing of the Calle Toledillo roadway
Summary
The tender covers partial resurfacing of the initial section of the Calle Toledillo roadway in El Puente del Arzobispo. The work includes removing 305 m² of existing concrete pavement up to 25 cm thick and replacing it with a 20 cm reinforced HA-25 concrete slab laid on a 15 cm limestone aggregate base. It also includes adjusting 8 manhole covers and drainage grates to the new road level, transporting construction debris to a destination less than 10 km away, and managing waste, quality control and site safety. The works are to be completed within 3 months from signature of the setting-out inspection record, with a 1-year warranty period. The budget is EUR 32,626.48 including VAT. The project proposes contractor classification E-1, category C; bidders should check the tender documents to confirm whether this classification is mandatory and to review the other participation requirements.
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.