Tender detail
Lighting improvements on Camino Fuente la Reina in Luque
Summary
The contract concerns the supply and complete installation of six solar-powered luminaires on Camino Fuente la Reina in Luque. The work includes foundations and other civil works, electrical installation, and operational testing. Each LED luminaire must have a maximum power of 30 W and luminous efficacy of at least 110 lm/W; the specified battery is 12 V, 30 Ah LiFePO4 or equivalent, and the galvanised-steel column is 5 m high. Foundations are to be reinforced concrete, approximately 0.6 × 0.6 × 0.6 m, using HA-25/20 concrete and B500S reinforcement; the minimum curing period is 7 days. The works must include occupational safety and environmental protection measures, taking account of the protected natural setting, vegetation and wildlife, and light pollution. The project budget is €10,000 including VAT. The document gives an overall planned period of six months and a construction period of six weeks. Detailed bidder qualification and submission requirements must be checked in the tender documents.
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.