Tender detail
Electric vehicle charging infrastructure on Dörrenbachstraße, Lebach
Summary
The tender concerns electric vehicle charging infrastructure and battery storage for the police station on Dörrenbachstraße in Lebach. The planned equipment comprises two 150 kW DC charging points and four 11 kW AC dual charging points. The battery storage system is intended to reduce demand on the electricity grid, smooth peak loads, and store surplus electricity from the photovoltaic system for later use. In the event of a power outage, the battery is to provide temporary uninterruptible power until the standby generator takes over. This is a supply contract; check the official contract notice and tender documents for the precise participation and technical requirements. The submission deadline is 2 November 2026.
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.