Tender detail
Gas supply contract
Summary
The tender concerns the gas supply contract for UKS – Universitätsklinikum des Saarlandes. It is an open procedure intended to secure the delivery of natural gas with an initial term starting 2028-01-01 and ending 2031-01-01, with extension options through 2033. The gas is procured through a structured, tranche-based approach, without lotting; abnahmestellen (consumption points) lie in the Stadtwerke Homburg network area. Estimated annual gas demand is about 120,420 MWh (118,320 MWh at two main supply points plus roughly 2,100 MWh extra per year due to a boiler renovation). The price mechanism combines tranche prices with a fixed service fee, and includes costs such as net usage charges, metering data provision, and other contractual charges; energy tax and similar levies are addressed as borne by the supplier in the described framework. The contract will be performed under an All-Inclusive gas supply arrangement. The REMIT data reporting framework applies, and the contracting authority may require supporting documents as part of the qualification process. The network area for delivery is within the Homburg region. Potential bidders should be aware of Russia-related exclusion rules and the requirement to provide standard eligibility and qualification documentation as part of the tender documents.
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.