Metalwork for the refurbishment and extension of Harrl Primary School in Bückeburg – Phase 4
Summary
The City of Bückeburg is procuring metalworking for phase 4 of the renovation of Harrl Primary School, covering the first floor, ground floor and the remaining basement area. The works include supplying and installing steel-profile reinforcements for door openings, dismantling two smoke-control door assemblies, and replacing handrails in the central and south stairwells: 210 m of existing handrails are to be removed and 210 m of stainless-steel handrails installed, together with 100 direction-change fittings and 50 end caps. The work also includes workshop drawings and site setup; the anticipated execution period is calendar weeks 9–47 of 2027.