Tender detail
ABS 38 Munich–Mühldorf–Freilassing: advance environmental measures, construction section 1.4
Summary
The contract covers advance environmental measures for construction section 1.4 of the ABS 38 railway route between Munich, Mühldorf and Freilassing. The works include creating and maintaining reptile habitats, sowing approximately 1.9 hectares, supplying habitat materials and planting shrubs, as well as deterring reptiles through mowing and vegetation cutting over approximately 5.8 and 0.7 hectares and installing approximately 780 metres of reptile fencing. Both work schedules are included in one contract; they are not separate lots.
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.