Tender detail
VRV air-conditioning system installation at the Critical Infrastructure Control Centre
Summary
The Community of Madrid is procuring works to install a direct-expansion VRV air-conditioning system at its Critical Infrastructure Control Centre, as a backup and support system for the existing central climate-control installation. The works cover an area of approximately 260 m² and include air-conditioning, associated civil and electrical works, waste management, and health and safety measures. The contract is not divided into lots, has an execution period of two months and a total estimated budget of €79,973.22 including VAT.
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.