Construction of a weak landfill-gas treatment plant at Freital-Saugrund landfill
Summary
The Upper Elbe Waste Management Association is procuring the supply and installation of a new compressor and weak landfill-gas treatment plant at the Freital-Saugrund landfill. The plant is intended to use landfill gas containing at least 3% methane, with an adjustable gas flow of 10–100 Nm³/h and thermal output of approximately 10–100 kW. The work also includes dismantling and properly disposing of the existing plant, a trial run of at least ten days, a safety inspection, emissions measurement and maintenance work in the condensate shaft. The procurement is not divided into lots.