Tender detail
Construction of Siarkowa Street and connecting roads in Tarnobrzeg
Summary
The City of Tarnobrzeg is procuring construction of the 463.06 m municipal road on Siarkowa Street, including connections on Żeglarska Street (80 m), Kajakowa Street (70 m) and Wakacyjna Street (35 m). The works include junction reconstruction, vehicle access points, pedestrian and cycle routes, street lighting, a technical duct, drainage, road signs and traffic-safety equipment, as well as obtaining the required permit for use of the road. The contract is not divided into lots and is to be completed within 380 days of signing.
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.