Tender detail
Construction of a publicly accessible electric vehicle charging station in the Municipality and City of Odolanów – second procedure
Summary
The tender covers the supply and installation of a publicly accessible electric vehicle charging station and a 17.1 kWp ground-mounted photovoltaic system in Odolanów. The charging facility must include two 120 kW vehicle charging bays with two DC CCS connectors and one 22 kW AC connector, plus a separate two-bay 3.6 kW charging station for electric two-wheelers. The system must support payments, public applications, OCPP 2.0.1 or later, administrative access, a documented API, and encrypted TLS 1.2 or later communications. The contract period is 30 days. The tender deadline is 18 September 2026 at 00:00, and tenders must be submitted electronically in Polish. Price accounts for 60% and the installation-work warranty period for 40% of the score; the minimum warranty is 4 years and a maximum of 10 years is taken into account. Participation requires evidence of at least two installations of electric vehicle charging stations of at least 80 kW and the required site manager and electrical works manager qualifications.
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.