Tender detail

Construction of a publicly accessible electric vehicle charging station in the Municipality and City of Odolanów – second procedure

Summary

The tender covers the supply and installation of a publicly accessible electric vehicle charging station and a 17.1 kWp ground-mounted photovoltaic system in Odolanów. The charging facility must include two 120 kW vehicle charging bays with two DC CCS connectors and one 22 kW AC connector, plus a separate two-bay 3.6 kW charging station for electric two-wheelers. The system must support payments, public applications, OCPP 2.0.1 or later, administrative access, a documented API, and encrypted TLS 1.2 or later communications. The contract period is 30 days. The tender deadline is 18 September 2026 at 00:00, and tenders must be submitted electronically in Polish. Price accounts for 60% and the installation-work warranty period for 40% of the score; the minimum warranty is 4 years and a maximum of 10 years is taken into account. Participation requires evidence of at least two installations of electric vehicle charging stations of at least 80 kW and the required site manager and electrical works manager qualifications.

Reference number
2026/BZP 00432268/01
Buyer
GMINA I MIASTO ODOLANÓW
Country
Poland (POL)
Procedure
Basic procedure
CPV
31158000 Chargers
Deadline
2026-09-18
Status
Open
Contract subject
Supplies
Estimated value
Not published
Source
POL_BZP

More tender information after sign-in