Tender detail
Installation of a photovoltaic system on the roofs of the Dom Pomocy Społecznej buildings in Pigża
Summary
The contract covers design-and-build delivery of a complete photovoltaic installation on the roofs of the Dom Pomocy Społecznej buildings in Pigża. The installation must have a capacity of 49.5 kWp and must not exceed 50 kWp, and must include an energy storage system with a capacity of 28–30 kWh and power of 10 kW, dynamic reactive-power compensation, monitoring, safety equipment and protection against parallel operation with a generator. The scope also includes design documentation, approvals and notifications, testing, commissioning, configuration, staff training and complete handover documentation. The contract is not divided into lots and must be completed within 2 months. Offers must be submitted electronically via the purchasing platform by 14 September 2026 at 00:00. Evaluation is based on price (80 points) and the warranty period for the works (20 points).
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.