Tender detail
Construction of the sanitary sewerage network with connections in Rędziny Municipality
Summary
The tender covers construction of sanitary sewerage infrastructure in Rędziny Municipality: 2,936 m of gravity sewer, 691 m of pressure sewer, 193 sewer connections with a total length of 1,132.50 m, 55 manholes, one wastewater pumping station with power supply, water connection, container, radio monitoring and fencing, and 180 m of water supply network. The works also include road-surface reinstatement, drilling and jacking works, temporary traffic-management designs, protection of existing utilities and technical acceptance procedures. The completion deadline is 30 November 2027. Tenders must be submitted electronically through the contracting authority's platform in Polish by 31 August 2026 at 09:00. The award criteria are price at 60% and the warranty and statutory defect-liability period at 40%. The tender guarantee is PLN 100,000.
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.