Tender detail
Pressure testing works on Pipeline L54 at the Fos oil terminal
Summary
The tender concerns preparatory and pressure testing works for Pipeline L54 in the area of the Fos-sur-Mer oil terminal and Fluxel facilities. It is divided into two separately awarded lots: supply and prefabrication of piping with installation and dismantling, and management of pressure testing, pigging operations, process monitoring, instrumentation and related activities. The expected duration is 6 months, and payment will be based on fixed prices. The tender submission deadline is 12 October 2026 at 12:00. The bidder must demonstrate the required financial and technical capacity, hold a valid MASE certification, and provide references for previous works and its quality-control arrangements. A site visit before submission is mandatory. The evaluation will assign 60% to price, 25% to technical quality, 10% to the execution period and 5% to environmental performance.
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.