Tender detail
Accessible Greenway Ramp and Cycle Lane Works in Tortosa
Summary
Tortosa City Council is procuring works in two lots to improve access for pedestrians and cyclists and connect the greenway with the Ferreries institutes. Lot 1 is a 71-metre accessible ramp, 2 metres wide, bridging a 6.32-metre level difference; Lot 2 adapts and signs a 313-metre-long, 2-metre-wide cycle-lane section (626 m²). The total tender budget is €194,422.13 including VAT, and each lot has a maximum execution period of three months.
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.