Tender detail
Railway infrastructure treatment works on line 050 between kilometre points 467+600 and 470+600
Summary
ADIF Alta Velocidad is procuring works to treat and stabilise railway infrastructure on line 050 between kilometre points 467+600 and 470+600, in the Lleida–Barcelona section of the Madrid–Zaragoza–Barcelona high-speed line. The works include stabilising the abutments of an overbridge, waterproofing the base of embankment slopes, cleaning and lining drainage channels, and associated site facilities. The contract has no lots, runs for six months and has a base budget of EUR 959,662.99 excluding VAT.
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.